Several issues related to hydrauligical conditions and mine slope stabilities are addressed with this drilling campaign.
A complex project involving geotechnical drilling in the vicinity of the Bobakas-Archaggelos open pits to provide geotechnical insights and hints for the ideal engineering solutions and design for a project involving (a) deviation of the incoming water surface runoff and (b) define the optimum overall mine slope with respect to ground competency.
Geotechnical drilling, field work, lab tests and delivery of geotechnical/hydraulic studies are jointly handled by Geotest's teams.
Complex project gathering multiple disciplines together.